Haier HPU-42C03, AP42NACAAA, AP42NACMAA, HPU-44H03, AU42NAIAAA, AU42NAIMCA 10m 15m 20m 25m 30m

Models: AP42NACAAA HPU-42C03 HPU-44H03 0010571223 AP42NACMAA AU42NAIMCA AU42NAIAAA

1 33
Download 33 pages 51.64 Kb
Page 31
Image 31

Installation procedures

3.Piping connection of outdoor unit.

Connect the connecting pipe and inlet and outlet liquid pipe according to the piping method.

4.Purging method

Discharge the air out of the indoor unit and the refrigerant pipe by vacuumizing

(1)Fasten all the nuts of the indoor and outdoor pipes to make these parts out of leakage.

(2)Under the condition of the complete close of the indoor and outdoor valve center (both liquid and gas side),dismount the repair valve cap.Vacuumizing through the charge mouth of the repair valve.

(3)After vacuumizing fasten the repair valve,and dismount the cap of the big and small stop valve,then loosen the stop valve center completely and fasten the big and small stop valve.

5.Extra charging amount of the refrigerant

When piping is longer than 5 m, charge additional refrigerant specified in this list.

Pipe length

 

5m

 

10m

15m

20m

25m

30m

 

 

 

 

 

 

 

 

 

Refrigerant charge (g)

 

 

 

250

500

750

1000

1250

 

 

 

 

 

 

 

 

 

 

28

Page 31
Image 31
Haier HPU-42C03, AP42NACAAA, AP42NACMAA, HPU-44H03, AU42NAIAAA, AU42NAIMCA, 0010571223 operation manual 10m 15m 20m 25m 30m