Power Supply Cord
NOTE: Your air conditioner’s device may differ from the one shown.
| A |
| B |
TEST | RESET |
A. Test button
B. Reset button
This room air conditioner is equipped with a power supply cord required by UL. This power supply cord contains
To test your power supply cord:
1.Plug power supply cord into a grounded 3 prong outlet.
2.Press RESET (on some devices, a green light will turn on).
3.Press TEST (listen for click; Reset button will trip, and on some devices, a green light will turn off).
4.Press and release RESET (listen for click; Reset button will latch, and on some devices, a green light will turn on). The power supply cord is ready for operation.
NOTES:
■The Reset button must be pushed in for proper operation.
■The power supply cord must be replaced if it fails to trip when the test button is pressed or fails to reset.
■Do not use the power supply cord as an off/on switch.
■A damaged power supply cord must be replaced with a new power supply cord obtained from the product manufacturer and must not be repaired.
■The power supply cord contains no user serviceable parts. Opening the
INSTALLATIONINSTRUCTIONS
UnpacktheAirConditioner
Remove Packaging Materials
■Remove and dispose of/recycle packaging materials. Remove tape and glue residue from surfaces before turning on the air conditioner. Rub a small amount of liquid dish soap over the adhesive with your fingers. Wipe with warm water and dry.
■Do not use sharp instruments, rubbing alcohol, flammable
fluids, or abrasive cleaners to remove tape or glue. These products can damage the surface of your air conditioner.
■Handle the air conditioner gently.
PrepareAirConditionerforInstallation
Prepare unit for installation
Unpack unit on the floor next to installationlocation.
1.Remove two front attachment screws.Separate the outer case from the front with a putty knife at the catch points designated by the arrows.
2.Remove the two screws on top of the outer case.
3.Using the basepan handle, slowly and evenly pull chassis out from outer case.
5