GDZ22-1 manual 10/22/01 11:45 AM Page 13

English

INSTALLATION INSTRUCTIONS

Select a suitable location for the dryer on a hard even surface away from direct sunlight or heat source e.g. radiators, baseboard heaters, cooking appliances etc. Any floor unevenness should be corrected with the leveling legs located on the bottom of the dryer.

Tools and Materials Required

Phillips head and flathead screwdrivers

Channel-lock adjustable pliers

1/2 inch open end wrench

Carpenter’s level

Measuring tape (12ft. min.)

Duct tape

Rigid or flexible metal 4 inch (10.2 cm) duct

Vent hood

Electrical Requirements

Power Supply:

3 or 4 wire, 240 Volt, 30 Amp, 60Hz, 1 Phase

Power Supply Cord Kit: (not supplied when sold in the United States) The dryer MUST employ a 3-conductor power supply cord NEMA 10-30 type SRDT rated at 240 Volt AC minimum, 30 Amp., with 3 open end spade lug connectors with upturned ends or closed loop connectors and marked for use with clothes dryers. If being installed in a manufactured (mobile) home, the dryer MUST employ a 4-conductor power supply cord NEMA 14-30 type SRDT or ST (as required) rated at 240 Volt AC minimum, 30 Amp., with 4 open end spade lug connectors with upturned ends or closed loop connectors and marked for use with clothes dryers. See Electrical Connections for A 4-Wire System.

Unpacking Your Dryer

1.Remove all packaging material. This includes the foam base and all adhesive tape holding the dryer accessories inside and outside.

2.Inspect and remove any remains of packaging, tape or printed materials before using the dryer.

12

Page 13
Image 13
Haier GDZ22-1 user manual Tools and Materials Required, Electrical Requirements, Unpacking Your Dryer, Power Supply