Haier 0010518181, HSU-09HG13-B Correct, Incorrect, Power Source Installation, On Drainage

Models: 0010518181 HSU-12HG13-B HSU-09HG13-B

1 8
Download 8 pages 15.66 Kb
Page 8
Image 8
1.Power Source Installation

1.Power Source Installation

2.Cutting and Flaring Work of Piping The power source must be exclusively used for air conditioner. (Over I0A)

Correct In the case of installing an air conditioner in a moist place, please install an earth leakage breaker.

Incorrect For installation in other places, use a circuit breaker as far as possible.

2.Cutting and Flaring Work of Piping

Lean Damage of flare Crack Partial Too outside Pipe cutting is carried out with a pipe cutter and burs must be removed. 3.On Drainage After inserting the flare nut, flaring work is carried out.

A

 

 

 

 

 

 

 

Pipe diameter(

) Size A(mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Liquid side

6.35mm(1/4")

0.8~1.5

 

 

 

 

 

 

Gas side

9.52mm(3/8")

1.0~1.8

 

 

 

 

Flare tooling die

 

 

 

 

 

 

 

 

Gas side

12.7mm(1/2")

1.2~2.0

 

 

 

 

 

 

Correct

Incorrect

Lean Damage of flare Crack Partial Too outside

3.On Drainage

Please install the drain hose so as to be downward slope without fail. Please don't do the drainage as shown below.

 

 

 

Less than 5cm

It becomes high midway.

The end is immersed

It waves.

The gap with the ground

There is the bad smell

 

in water.

 

is too small

from a ditch

Check for Installation and Test Run Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out surely to outdoor.

Check Items for Test Run In case that the attached drain hose is in a room, please apply heat insulation to it without fail.

Check for Installation and Test Run

Manual background Please kindly explain to our customers how to operate through the instruction manual.

Check Items for Test Run

Put check mark in boxes

Manual background Gas leak from pipe connecting?

Manual background Heat insulation of pipe connecting?

Manual background Are the connecting wirings of indoor and outdoor firmly inserted to the terminal block?

Manual background Is the connecting wiring of indoor and outdoor firmly fixed?

Manual background Is drainage securely carried out? Manual background

Manual background Is the earth line securely connected?

Manual background Is the indoor unit securely fixed?

Manual background Is power source voltage abided by the code?

Manual background Is there any noise?

Is the lamp normally lighting? Are cooling and heating (when

in heat pump) performed normally? Is the operation of room temperature regulator normal?

8

Page 8
Image 8
Haier 0010518181 Correct, Incorrect, Power Source Installation, Cutting and Flaring Work of Piping, On Drainage