Haier HSU-1218CR03 Power Source Installation, Cutting and Flaring Work of Piping, On Drainage

Models: HSU-1218CR03

1 8
Download 8 pages 20.78 Kb
Page 8
Image 8
1.Power Source Installation

1.Power Source Installation

2.Cutting and Flaring Work of Piping The power source must be exclusively used for air conditioner. (Over I0A)

Correct In the case of installing an air conditioner in a moist place, please install an earth leakage breaker.

Incorrect For installation in other places, use a circuit breaker as far as possible.

2.Cutting and Flaring Work of Piping

Lean Damage of flare Crack Partial Too outside Pipe cutting is carried out with a pipe cutter and burs must be removed. 3.On Drainage After inserting the flare nut, flaring work is carried out.

A

Flare tooling die

 

Pipe diameter(

) Size A(mm)

Liquid side

6.35mm(1/4")

0.8~1.5

 

 

 

Gas side

12.7mm(1/2")

1.2~2.0

Correct

Incorrect

Lean Damage of flare Crack Partial Too outside

3.On Drainage

Please install the drain hose so as to be downward slope without fail. Please don't do the drainage as shown below.

 

 

 

Less than 5cm

It becomes high

The end is immersed

It waves.

The gap with the ground

There is the bad smell

midway.

in water.

 

is too small

from a ditch

Check for Installation and Test Run Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out surely to outdoor.

Check Items for Test Run In case that the attached drain hose is in a room, please apply heat insulation to it without fail.

Check for Installation and Test Run

Manual background Please kindly explain to our customers how to operate through the instruction manual.

Check Items for Test Run

Put check mark in boxes

Manual backgroundManual background Gas leak from pipe connecting?

Manual backgroundManual background Heat insulation of pipe connecting?

Manual backgroundManual background Are the connecting wirings of indoor and outdoor firmly inserted to the terminal block?

Manual backgroundManual background Is the connecting wiring of indoor and outdoor firmly fixed?

Is drainage securely carried out?

Is the lamp normally lighting?

Is the earth line securely

Are cooling and heating (when

connected?

in heat pump) performed normally?

Is the indoor unit securely fixed?

Is the operation of room temperature

Is power source voltage abided

regulator normal?

by the code?

 

Is there any noise?

 

8

Page 8
Image 8
Haier HSU-1218CR03 Power Source Installation, Cutting and Flaring Work of Piping, On Drainage, Correct, Incorrect