Haier 0010554405B Power Source Installation, Cutting and Flaring Work of Piping, On Drainage

Models: 0010554405B HSU-24HD0307 HSU-24HK0307

1 8
Download 8 pages 55.68 Kb
Page 8
Image 8
1.Power Source Installation

1.Power Source Installation

2.Cutting and Flaring Work of Piping The power source must be exclusively used for air conditioner. (Over I0A)

3.On Drainage In the case of installing an air conditioner in a moist place, please install an earth leakage breaker.

Check for Installation and Test Run For installation in other places, use a circuit breaker as far as possible.

2.Cutting and Flaring Work of Piping

Check Items for Test Run Pipe cutting is carried out with a pipe cutter and burs must be removed. Manual background After inserting the flare nut, flaring work is carried out.

A

Flare tooling die

1.Cut pipe

2.Remove burs

3.Insert the flare nut

4.Flare pipe

 

 

Pipe diameter(

) Size A(mm)

 

 

Liquid side

6.35mm(1/4")

0.8~1.5

 

 

Liquid side

9.52mm(3/8")

1.0~1.8

 

 

Gas side

9.52mm(3/8")

1.0~1.8

 

 

Gas side

12.7mm(1/2")

1.2~2.0

 

 

 

 

 

 

 

Gas side

15.88mm(5/8")

1.2~2.0

 

Correct

Incorrect

Lean Damage of flareCrack Partial Too outside

3.On Drainage

Please install the drain hose so as to be downward slope without fail. Please don't do the drainage as shown below.

Less than 5cm

It becomes high midway.

The end is immersed

It waves.

The gap with the ground

 

in water.

 

is too small

There is the bad smell from a ditch

Manual background Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out surely to outdoor.

Manual background In case that the attached drain hose is in a room, please apply heat insulation to it without fail.

Check for Installation and Test Run

Manual background Please kindly explain to our customers how to operate through the instruction manual.

Check Items for Test Run

Put check mark in boxes

Manual backgroundManual background Gas leak from pipe connecting?

Manual backgroundManual background Heat insulation of pipe connecting?

Manual backgroundManual background Are the connecting wirings of indoor and outdoor firmly inserted to the terminal block?

Manual backgroundManual background Is the connecting wiring of indoor and outdoor firmly fixed?

Is drainage securely carried out?

Is the lamp normally lighting?

Is the earth line securely

Are cooling and heating (when

connected?

in heat pump) performed normally?

Is the indoor unit securely fixed?

Is the operation of room temperature

Is power source voltage abided

regulator normal?

by the code?

 

Is there any noise?

 

8

Page 8
Image 8
Haier 0010554405B Power Source Installation, Cutting and Flaring Work of Piping, On Drainage, Check Items for Test Run