| Right | Left |
| |
To | Doorway | Doorway | To | |
Stud (7) | Stud (6) | |||
Corner | Corner | |||
|
| |||
Stud (29) |
|
| Stud (1) | |
|
| Front Floor Plate (17) |
|
View from above
5.Install the Left and Right Doorway Studs (6, 7) to the outside of the frame so that they rest flat against the frame. Their orientation should be the same as shown above. Slide a Bolt (43) into each slot for later Front Brace (23) assembly. Slide a
6.Remove the bottom Bolt from the Corner Brackets (13) at the front of the greenhouse. Install the Front Diagonal Braces (25) with their flanges facing inward to the bottom hole of the Brackets on the inside using Bolts (43). Attach the bottom of the Front Diagonal Braces (25) to the Bolt left exposed on the Floor Plate (17) from the last step. (See Figure C.)
7.Remove next bolt up from the front Corner Brackets (13). Connect the Front Braces (23) to the exposed hole. Connect the loose ends of the Front Braces (23) to the Doorway Studs (6, 7), using the Bolts (43) included in the Doorway Studs (6, 7) in step 5, above. (See Figure C.)
8.Attach the Door Slide Support (19) to the
| Spacer (39) between the Support and the Stud. (See Figure C, | 19 |
| inset, and diagram to the right.) | 38 |
9. | The frame should now rest square. Measure diagonally from cor- | 3 |
| ||
| ner to corner at the top. If the measurements are not equal, adjust | 39 |
| the frame as needed until square. Some Nuts (52) may need to | 23 |
| be temporarily loosened to adjust the frame properly. |
|
10.Place the Gutter End Caps (48) onto the ends of the Side Ceiling Plates (36) oriented with a gap in the bottom to allow water to drain out of the gutters.
SKU 94515 | For technical questions, please call | Page 10 |