Harbor Freight Tools 94515 manual Frame Assembly, Lay out all parts by number prior to assembly

Models: 94515

1 18
Download 18 pages 60 Kb
Page 6
Image 6
FRAME ASSEMBLY

FRAME ASSEMBLY

Unless noted otherwise, all frame parts will be attached using the Bolts

(43) and Nuts (52) provided. Bolts should all be assembled with their heads facing the outside of the greenhouse. Tighten Nuts only about 1/4 turn past finger-tight; be careful not to overtighten.

Lay out all parts by number prior to assembly.

An assistant or an appropriate support (not included) will be useful to keep the partially assembled parts upright during assembly. An assistant should be used to assemble the Crown pieces to the rest of the frame.

Assemble on a clear, calm day. Wind may damage the Greenhouse and will make assembly difficult.

Cross Section

Assembling the Outer Frame

1.Lay all Floor Plates (16, 17, 34) out on top of the base with the flanges facing the outside of the greenhouse as shown above. Make sure that the Front Floor Plate

(17)is on the side that you want your door to be located.

2.There are four Corner Studs (1, 29) to be attached to the Floor Plates (16, 17, 34), the end with two holes should be at the bottom. As explained below, attach Left- hand Corner Studs (1) on the outside of the front-left and rear-right corner using two Bolts each Stud. Attach the Right-hand Corner Studs (29) on the outside of the two remaining corners, also as explained below.

To attach the corner studs, as shown to the right: 1) slide a Hold Down Connector (55) up under the rail and over the end of the Bolt (43), then 2) secure it using a Nut (52). Use two Hold Down Connectors for each Cor- ner Stud.

SKU 94515

For technical questions, please call 1-800-444-3353.

Page

Page 6
Image 6
Harbor Freight Tools 94515 manual Frame Assembly, Lay out all parts by number prior to assembly, Cross Section