Installing
Place the stove on a noncombustible floor pro- |
|
tector and away from combustible walls at least as |
|
far as shown in figure 2 and 3. Note that the clear- |
|
ances shown are minimum for safety but do not leave |
|
much room for access when cleaning or servicing. |
|
Please take this into account when placing the stove. |
|
Place the Room Sensing Probe in the desired |
|
location and run standard thermostat wire back to |
|
the terminals on the back of the stove and connect |
|
with the two terminals provided. Unlike a wall ther- |
|
mostat the RS probe can be placed anywhere and go |
|
unnoticed. We recommend the room sensor be in- |
|
stalled even if only cut short and connected to room |
|
sensor remote ports. |
|
Connect the power cord to a 120 volt recep- |
|
tacle. |
|
Prior to installing flue pipe, connect draft and |
|
meter to stove. (The draft meter must have a mini- |
|
mum range of |
|
source. Set control board to test mode. Record draft | Fig. 2 |
reading here _______ (should read at least .5"). |
|
3"
After connecting the flue system, follow the above procedure. However, prior to taking the draft reading be sure all doors and windows to the home are closed. Record the draft reading_______. If this
reading is more than .1" lower than the unconnected reading check for possible restrictions or the need for outside air (see page 5).
Mobile Home Installation
When installing the Invincible RS in a mobile home it is required that the stove be bolted to the floor. This is usually done inside the pedistal base where the bolt will not be visible and requires drill- ing a hole where it is best suited.
1" | 2" |
| 6" |
| 12" |
| 6" |
Fig. 3
4