
14)For 8 ton capacity and below:
Pull the end of the load chain [47] out between the right guide roller [20] and the load sheave [14] (no load side) and insert it to the anchorage (stopper) [22]. Insert the stopper pin [23] and fix it with a split pin [24].
: Make sure the load chain is not twisted and the split pin in the stopper pin is bent securely.
32