Heat & Glo • 6000G, 6000G-IPI • 2103-900 Rev. O • 12/0822

A. Vent Termination Minimum Clearances

Roof Pitch H (Min.) Ft.
Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0
Figure 6.1 Minimum Height From Roof To Lowest Discharge
Opening
* 3 foot minimum in snow regions
HORIZONTAL
OVERHANG
VERTICAL
WALL
GAS DIRECT VENT
TERMINATION CAP
12
X
ROOF PITCH
IS X/ 12
LOWEST
DISCHARGE
OPENING
2 FT.
MIN.
20 INCHES MIN.
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
6
6 Termination Locations
Fire Risk.
Maintain vent clearance to combustibles as
speci ed.
DO NOT pack air space with insulation or other
materials.
Failure to keep insulation or other materials away
from vent pipe may cause overheating and re.
WARNING

Gas, Wood or Fuel Oil

Termination Cap

B

Gas

Termination

Cap **

A*

*Ifusing decorative cap c over(s), this distance may need to be
increased.Refer to the installation instruc tions supplied with the
decorativecap cover.
** Ina staggered installation with both gas and wood term inations, the
woodtermination cap must be higher than the gas termination cap.
AB
6in.(minimum)upto20in.
152mm/508mm 18in. minimum
457mm
20in. and over 0in. minimum
Figure 6.2 Staggered Termination Caps