Heat & Glo LifeStyle PIER-40 D. Install Termination Cap, Refer to termination cap instructions

Models: PIER-40

1 52
Download 52 pages 27.91 Kb
Page 34
Image 34
D. Install Termination Cap

D. Install Termination Cap

Install the chimney sections up through the chase enclo- sure.

Refer to termination cap instructions.

Warning! Risk of Fire! The minimum overlap of cap to pipe (as shown in the following illustrations) MUST be met or chimney may separate from cap. Separation allows sparks, heat and embers to escape.

Notice: Paint the termination cap with a rust-resistant paint to protect against the effects of corrosion on those parts exposed to the weather.

TR11 Round Termination Cap

TR11T Round Telescoping Termination Cap

Assemble

Termination

storm collar

Cap

around extended

 

termination cap

 

pipe

 

once cap is

 

installed.

Do NOT

 

Caulk gaps between

block air

holes

storm collar & pipe,

Storm

and storm collar

Collar

& chase top.

3 clip brackets.

 

Slip over chase collar

 

and attach with screws

 

provided.

Collar

 

2 in. (51 mm)

14 1/2 in. (368 mm)

Minimum Height

Maximum

 

Termination

Cap

Slip

storm collar

around chimney pipe

before termination cap pipe is snapped into the chimney pipe.

Caulk gaps between

Storm

storm collar & pipe,

Collar

and storm collar

 

& chase top.

 

Collar

 

2 in. (51 mm)

Chimney

Minimum Height

Pipe

 

Chase Top

 

Do NOT

block air holes

6 in. (153 mm) Minimum top of chase to top of chimney pipe

Chase Top

Chase

Chimney

Pipe

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

Figure 9.5 Installing a TR11T Round Telescoping Termination Cap

ST1175 Square Termination Cap

Chase

Termination cap pipe and chimney section must be snapped together to maintain an overlap of 1-1/2 in. (38 mm).

Figure 9.4 Installing a TR11 Round Termination Cap

Flange

Termination Cap

Collar

2 in. (51 mm)

Minimum Height

Chase Top

Chimney

Pipe

Place waterproof caulk or sealer under each flange of the termination cap and on top of each screw to help prevent leaks.

The last section of pipe must stop between 2 in. (51

mm)above the top of the chase and 4 3/4 in. (121

mm) below the top of the chase.

2 in. (51 mm)

maximum

4 3/4 in. (121 mm)

maximum

Chase

Termination cap pipe and chimney section must overlap 1-1/2 in. (38 mm)

Figure 9.6 Installing an ST1175 Square Termination Cap

34

Heat & Glo • BAY-40, PIER-40 • 34977 • Rev AB 7/12

Page 34
Image 34
Heat & Glo LifeStyle PIER-40 D. Install Termination Cap, Refer to termination cap instructions, TR11 Round Termination Cap