Heat Controller Comfort Air Tools Needed, Window Requirements, Unit & Window Size, Installation

Models: Comfort Air

1 24
Download 24 pages 59.84 Kb
Page 3
Image 3
Tools Needed

Tools Needed

p

Screwdrivers

p

Ruler

or

 

 

 

tape measure

 

p

Level

p

Pencil

 

Window Requirements

1.Air conditioner is factory prepared for installation in standard double hung window (air conditioner cannot be installed in other types of windows without modification, consult with a qualified installation serviceman).

2.Install the air conditioner in a window where there will be enough clearance around the cabinet to allow ample circulation of air through the unit.

3.All supporting parts should be secured to firm wood, masonry or metal.

Unit & Window Size

1.If your air conditioner cabinet is 20” wide, it will fit window openings 23 7/8” to 39” in width. Minimum opening height is 12 3/4” from bottom of sash to sill. Removal of both filler panels permits installation in windows with a minimum opening width of 20 1/4”. This size unit requires one leveling bracket (Fig. 1).

2.If your air conditioner cabinet is 23 3/4” wide, it will fit window openings 27 5/8” to 39” in width. Minimum opening height is 16” from bottom of sash to sill. Removal of both filler panels permits installation in windows with a minimum opening width of 24”. This size unit requires two leveling brackets (Fig. 2).

Attach Filler Panels On some models...

1.Attach filler panels to the existing holes in the cabinet using the supplied screws (Fig. 3).

Installation in Normal Width Window

1.Open and mark center line of window. Depending on the size of your unit, attach one leveling bracket on the center line of the window or one 8” to the right and one 8” to the left of the center line. Brackets may be attached to window sill in either direction for maximum support, depending on the depth of the window sill.

2.Mark line 1 1/4” from edge of window sill and fasten leveling bracket with 1” long wood screws at mark through larger holes in bracket (Fig. 4).

3.Screw leveling bolt in 3/8” threaded hole of leveling bracket and adjust so bolt is 1/4” below top of window sill (Fig. 5).

4.Repeat steps 2 and 3 for second leveling bracket, if required.

INSTALLATION

WINDOW INSTALLATON

1

ScrewdriversRuler 2378” to 39”tape measure

1234

min.

2

LevelPencil 2758” to 39”Window Requirements

16”

min.

3

Top bar

Filler panelUnit & Window Size

 

Screws

Bottom bar

Cabinet

 

 

 

 

 

 

 

 

4

 

 

OUTSIDE VIEW

 

1” long

 

3/8” threaded hole

 

wood screw

 

 

1 1/4” spaceAttach Filler Panels On some models...

Sill edge

 

Leveling bolt

 

Leveling bracket

 

 

 

 

 

 

 

 

 

 

 

 

5

Sill edge

Screw

1/4”

 

 

 

 

 

 

1 1/4” space

SIDE VIEW

3

Page 3
Image 3
Heat Controller Comfort Air Tools Needed, Window Requirements, Unit & Window Size, Attach Filler Panels On some models