Heat Controller PE-91A PE-121A owner manual Drain Excess Condensate Water, Condensate Disposal

Models: PE-91A PE-121A

1 23
Download 23 pages 42.67 Kb
Page 18
Image 18
10.DRAIN EXCESS CONDENSATE WATER

10.DRAIN EXCESS CONDENSATE WATER

Condensate Disposal:

Under normal operating conditions, this unit is designed to dispose of condensate collected via an internal system that pumps water onto the hot condenser coil for re-evaporation. It is then expelled to the outdoors via the air outlet hose. If the unit is operated for prolonged periods during very high humidity conditions, this system may become overwhelmed and the unit will shut off. Excess water must be drained from the unit before it will restart.

Lower Drain Port

Upper Drain Port

Drain Water from Upper Drain Port:

Procedures: Connect the Water Drain House to the Upper Drain Port allowing water to flow to a water bucket. (See above illustration). Remember to reinstall the cap on Upper Drain Port after draining water. The Upper Drain Port can be used if a floor drain or some other means of disposing of condensate is not available.

Drain Water from Lower Drain Port: (Before Long Term Storage Only)

Procedures: Remove the Rubber Drain Plug on Lower Drain Port. Connect the Water Drain Hose to allow water to drain to a floor drain or other water outlet. Remember to reinstall the Rubber Drain Plug after draining water.

18

Heat Controller, Inc.  1900 Wellworth Avenue  Jackson, MI 49203

Page 18
Image 18
Heat Controller PE-91A PE-121A Drain Excess Condensate Water, Condensate Disposal, Drain Water from Upper Drain Port