D. REPLACEMENT UNITS
To prevent failure of a new condensing unit, the existing evaporator tubing system must be correctly sized and cleaned or replaced. Care must be exercised that the expansion device is not plugged. For new and replacement units, a liquid line filter drier should be installed and refrigerant tubing should be properly sized. Test the oil for acid. If positive, a suction line filter drier is mandatory.
IMPORTANT: WHEN REPLACING AN
REPLACE THE LINE SET OR ENSURE THAT THE EXISTING LINE SET IS THOR-
OUGHLY CLEANED OF ANY OLD OIL OR DEBRIS.
!CAUTION
Only use evaporators approved for use on
E. EVAPORATOR COIL
REFER TO EVAPORATOR COIL MANUFACTURER’S INSTALLATION INSTRUC-
TIONS:
IMPORTANT: The manufacturer is not responsible for the performance and operation of a mismatched system, or for a match listed with another manufacturer’s coil.
XVII. EVACUATION AND CHARGING
The evacuation of any system component that has been exposed to atmosphere or lost its charge is essential before charging. Never attempt to operate a system while it is under a vacuum.
FIGURE 9
TYPICAL FIELD WIRING CONNECTIONS — 61⁄2 AND 71⁄2 TON
15