BUILDER'S CHOICE SERIES INSTALLATION INSTRUCTIONS
c.Firestop Spacer/Chimney Installation
Frame an opening and install an FS6 Firestop Spacer whenever the vent penetrates a ceiling/ floor area, as shown in Figure 16. Frame the opening with the same sized lumber as used in the ceiling/floor joists. Do not pack insulation around the chimney.
Figure 16
Installing the Firestop Spacer
Roof Pitch | H (Min.) Ft. |
Flat to 6/12 | 1.0 |
6/12 to 7/12 | 1.25 |
Over 7/12 to 8/12 | 1.5 |
Over 8/12 to 9/12 | 2.0 |
Over 9/12 to 10/12 | 2.5 |
Over 10/12 to 11/12 | 3.25 |
Over 11/12 to 12/12 | 4.0 |
Over 12/12 to 14/12 | 5.0 |
Over 14/12 to 16/12 | 6.0 |
Over 16/12 to 18/12 | 7.0 |
Over 18/12 to 20/12 | 7.5 |
Over 20/12 to 21/12 | 8.0 |
Table 1
Chimney Height
d.Chase/Termination Installation
Figures 17 and 18, and Table 1 specify minimum chimney heights for various pitched roofs.
These chimney heights are necessary for safety and do not ensure
Figure 17
Chimney Height for Vertical Termination
Figure 18
Multiple Vertical Termination Clearances
Note: To ensure proper operation, verify all venting and the termination are unobstructed.