Heatiator CB4236IR Finishing, A. Mantel and Wall Projections, B. Facing Material, Mantels

Models: CB4842IR CB4236IR

1 40
Download 40 pages 61.2 Kb
Page 28
Image 28
13 Finishing

13 Finishing

A. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing closer than the minimums listed must be constructed entirely of noncombustible materials (i.e., steel studs, concrete board, etc.) Failure to comply could cause fire.

Mantels

 

 

 

 

 

 

 

 

 

 

 

30 in. minimum

 

 

 

 

 

 

 

 

 

 

 

to ceiling

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

16

17

 

 

 

 

 

 

 

 

 

15

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

 

15-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14-1/2

 

 

 

 

 

 

 

 

13

 

 

 

 

 

 

 

 

12

13-3/4

 

 

 

 

 

 

 

 

13

 

 

 

 

 

 

 

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

12-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

11-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10-3/4

 

 

 

 

 

 

 

 

8

10

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

6

9-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

8-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7-3/4

 

 

 

 

 

 

 

 

4

7

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

5-1/26-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

Measured from top of hood (in inches)

Figure 13.1 Minimum Vertical and Maximum Horizontal Dimen- sions

Mantel Legs or Wall Projections

Top of

 

Appliance

Drywall

 

A. Mantel and Wall ProjectionsB. Facing Material AManual background

Manual background B Manual background

Manual background Mantel Leg or

Perpendicular Wall

A1 in. (25 mm) min. to perpendicular wall

B3-1/2 in. (89 mm) min. from fireplace opening to perpendicular wall

Figure 13.2 Mantel Leg or Wall Projections (Acceptable on both sides of opening)

B. Facing Material

Metal front faces may be covered with non-combustible materials only.

Facing and/or finishing materials must not interfere with air flow through louvers, operation of louvers or doors, or access for service.

Facing and/or finishing materials must never overhang into the glass opening.

Observe all clearances when applying combustible materials.

Seal joints between the finished wall and appliance top and sides using a 300 °F minimum sealant. Refer to Figure 13.3.

WARNING! Risk of Fire! DO NOT apply combustible ma- terials beyond the minimum clearances. Comply with all minimum clearances to combustibles as specified in this manual. Overlapping materials could ignite and will inter- fere with proper operation of doors and louvers.

These surfaces

may be covered

with non-combustible

material.

Non-combustible

sealant.

Figure 13.3 Noncombustible Facing Diagram

28

Heatilator • Caliber BV Series • 4040-262 • Rev M • 08/09

Page 28
Image 28
Heatiator CB4236IR Finishing, A. Mantel and Wall Projections, B. Facing Material, Mantels, Mantel Legs or Wall Projections