2-10. Positioning Jumper Links

200 VOLTS

230 VOLTS

460 VOLTS

S-144 918-C

2

1

Tools Needed:

3/8 in

230VOLTS

460VOLTS

575 VOLTS

S-144 916-A

Check input voltage available at site.

1 Jumper Links Access Door Open door.

2 Jumper Link Label

3 Input Voltage Jumper Links

3

Move jumper links to match input

 

 

voltage.

 

Close and secure access door.

 

Close door.

Ref. ST-801 789-A

2-11. Installing Work Clamp

2

1

3

Tools Needed: 1/2 in

1Work Cable

2Hardware

3Work Clamp

Route cable through clamp handle and secure as shown.

Ref. ST-802 062