2-10. Positioning Jumper Links
200 VOLTS
230 VOLTS
460 VOLTS
2
1
Tools Needed:
3/8 in
230VOLTS
460VOLTS
575 VOLTS
Check input voltage available at site.
1 Jumper Links Access Door Open door.
2 Jumper Link Label
3 Input Voltage Jumper Links
3 | Move jumper links to match input |
| |
| voltage. |
| Close and secure access door. |
| Close door. |
Ref.
2-11. Installing Work Clamp
2
1
3
Tools Needed: 1/2 in
1Work Cable
2Hardware
3Work Clamp
Route cable through clamp handle and secure as shown.
Ref.