OWNERS
M A N U A L
NOTE:
BE SURE CABLE RUNS BETWEEN THE
PULLEY AND THE GUARD PIN.
NOTE:
BE SURE CABLE RUNS OVER
TOP SIDE OF FRAME BOLT.
25 BB
CV CC
| 5 |
| CC |
| K |
| DETAIL A |
| NOTE: when securing (DH), Wrench |
| Tighten bolts till snug, then back off |
FINE TUNING: | 1/2 turn or until (DH) swings freely. |
| |
LOOSEN JAM NUT AND THREAD BOLT |
|
IN/OUT TO GIVE THE CABLE PROPER |
|
TENSION. |
|
| FINE TUNING: |
| LOOSEN JAM NUT AND THREAD BOLT |
| IN/OUT TO GIVE THE CABLE PROPER |
| TENSION. |
WARNING: | NOTE: SEE DETAIL |
CABLE BOLT MUST BE THREADED |
|
A MINIMUM OF 1/2” INTO ITS RECEIVER |
|
WITH JAM NUT TIGHTENED SECURELY TO |
|
ENSURE PROPER CONNECTION. |
|
NOTE:
BE SURE CABLE RUNS BETWEEN
PULLEY AND FRAME BOLT.
25136 13/16” [3475mm]
CV
HD1700 Assembly | Page - 18 |