Contents
Main
Installation, Operation, & Maintenance Instruction
Models DC2, 3, 4, 5, and 6
Bulletin #: IOM-OM-1104- E
Pulsafeeder Factory Service Policy
Safety Considerations:
Revision History:
Table of Contents
Page
1. Introduction
2. Principles Of Operation
2.1 Reagent Head Assembly
2.2 Control Assembly
2.3 Gear Ratio Assembly
3. Equipment Inspection
4. Storage
4.1.1 Short Term
4.1.2 Long Term
5. Installation
5.2 Piping System
5.3 Suction Pressure Requirements
5.4 Discharge Pressure Requirements
6. Equipment Startup
6.1 Fastener Inspection
6.2 Output Adjustment
6.3 Priming the Reagent Head
6.4 Calibration
7. Maintenance
7.1 Lubrication
7.2 Wet End Removal, Inspection, & Reinstallation
7.2.1 Diaphragm Removal & Reinstallation
7.3 Check Valves
7.3.1 General Description
Page
7.3.2 Check Valve Removal & Reinstallation, Cartridge type
7.3.3 Check Valve Removal & Reinstallation, Tie-bar type
Page
7.4 Motor Removal & Reinstallation
7.5 Gearset Removal
Page
7.6 Gearset Replacement
8. Replacement Parts
8.1 KOPkit Program
8.2 Ordering KOPkits or Parts
8.3 KOPkit numbers by model:
21
9. Model Number Identification
22
10. Wet End Materials Reference
11. Troubleshooting
Page
12. Piping Accessories
13. Dimensional Drawing
Letters reference dimensional table on next page
Page
Page
14.2 Bill of Materials, DC2
Page
14.3 Bill of Materials, DC3
Page
This page intentionally left BLANK
Page
14.5 Bill of Materials, DC4
Page
14.6 Bill of Materials, DC5
Page
14.7 Bill of Materials, DC6