INTRODUCTION IMPORTANT PRECAUTIONS
ASSEMBLY
BEFORE YOU BEGIN
ELLIPTICAL OPERATION
CONDITIONING GUIDELINES
A S S E M B LY STEP 7 |
|
|
|
|
|
| U BRACKET |
| BOLT (G) |
| SPLIT |
SPLIT TEFLON WASHER (E) | TEFLON WASHER (E) | ||
|
|
| |
| FOOTPLATE TUBE |
| INSERT |
|
|
| SPACER |
|
|
| THIS |
|
|
| DIRECTION |
| TEFLON WASHER (E) |
|
|
SPACER (F) |
|
| FOOTPLATE TUBE |
|
|
| |
| FLAT WASHER (C) | SPACER (F) | |
U BRACKET |
|
|
|
LOWER LINK ARM |
|
|
|
| TOP VIEW OF LEFT FOOT PAD | ||
BOLT (G) |
|
|
|
FLAT WASHER (C) |
|
|
|
PEDAL ARMS |
|
|
|
A ) Open HARDWARE BAG FOR STEP 7.
B)Align LOWER LINK ARM with U BRACKET.
CAUTION: Be careful to keep the LOWER LINK ARM aligned with guide rail. Do not twist it to the left or right while positioning it on the U BRACKET.
C)Slide SPACER (F) through U BRACKET and FOOTPLATE TUBE.
D)Insert FLAT WASHER (C) and BOLT (G) into outside end of FOOTPLATE TUBE
E)Insert 2 SPLIT TEFLON WASHERS (E) on left and right sides of FOOT PLATE TUBE & Tighten Bolt (G).
F)Repeat on other side.
A S S E M B LY STEP 8 |
|
INSIDE |
|
ELBOW COVER | LOWER HANDLEBAR |
| OUTSIDE |
| ELBOW COVER |
| SCREW (L) |
LOWER LINK ARM |
|
A)Open HARDWARE BAG FOR STEP 8.
B)Attach the OUTSIDE ELBOW COVER to elbow joint using 1 SCREW (L).
C)Snap the INSIDE ELBOW COVER onto the OUTSIDE ELBOW COVER. Note the position of the snap tabs before snapping into position.
D)Repeat on other side.
HARDWARE BAG FOR STEP 8 CONTENTS :
IMPORTANT PRECAUTIONS INTRODUCTION
ASSEMBLY
BEFORE YOU BEGIN
ELLIPTICAL OPERATION
CONDITIONING GUIDELINES
TROUBLESHOOTING LIMITED & MAINTENANCE WARRANTY
14
HARDWARE BAG FOR STEP 7 CONTENTS :
SPLIT TEFLON WASHER (E) 24 mm
Qty: 4
SPACER (F) 70 mm axis Qty: 2
BOLT (G) | FLAT WASHER (C) |
15 mm | 35 mm |
Qty: 2 | Qty: 2 |
4$3&8 - NN 2UZ
15
LIMITED TROUBLESHOOTING WARRANTY & MAINTENANCE
HZ_Ellipticals_Rev.1.5.indd | 8/15/06 2:35:51 PM |