D. Setup
1.Install the Toe Kick
1)Remove the plastic film from the toe kick.
2)Block the rollers to prevent the unit from rolling. See Fig. 2. Tilt the unit back.
NOTICE! Protect the floor. Do not tilt the unit more than 45°. Support the unit so it does not topple over.
3)Clean the toe kick attachment area with a clean soft cloth using a mild soap to remove any oil or dirt. Dry the toe kick attachment area thoroughly with a clean soft cloth.
4)Peel off the liner from the
5)Attach the toe kick to the bottom of the unit.
6)Apply firm pressure along the base of the toe kick to secure it in position.
2.Install the Top Trim
To achieve a
1)Remove the plastic film from the top trim.
2)Clean the unit's top panel with a clean soft cloth using a mild soap to remove any oil or dirt. Dry the top panel thoroughly with a clean soft cloth.
3)Peel off the liner from the
4)Attach the top trim to the top panel.
5)Apply firm pressure along the base of the trim to secure it in position.
3.Position and Level the Unit
Position the unit in its permanent location. Level the unit by adjusting the legs.
NOTICE! Do not remove the legs. The legs are necessary to maintain proper clearance for airflow.
4. Adjust the Shelves
The unit comes with 2 lower shelves and 1 upper shelf. Adjust shelf positions as needed.
| Top Trim |
Fig. 2 |
|
Rollers |
|
Leg | Leg |
| Toe Kick |
| 9 |