Hoshizaki KML-450MWH 10Move the Service Switch to the “WASH” position, 14Remove the Front Panel

Models: KML-450MWH KML-450MAH

1 22
Download 22 pages 61.68 Kb
Page 19
Image 19

10)Move the Service Switch to the “WASH” position.

11)Replace the Insulation Panel and the Front Panel in their correct positions.

12)Turn on the power supply and start the washing process.

13)Turn off the power supply after 30 minutes.

14)Remove the Front Panel.

15)Move the Service Switch to the “DRAIN” position.

16)Replace the Front Panel and turn on the power supply for 2 minutes.

17)Turn off the power supply and remove the Front Panel.

18)Move the Control Switch to the “ICE” position.

19)Replace the Front Panel in its correct position.

20)Turn on the power supply to fill the Water Tank with water.

21)Turn off the power supply after 3 minutes.

22)Remove the Front Panel.

23)Move the Control Switch to the “SERVICE” position; then move the Service Switch to the “WASH” position

24)Replace the Front Panel in its correct position.

25)Turn on the power supply to rinse off the cleaning solution.

26)After 5 minutes, turn off the power supply.

27)Remove the Front Panel.

28)Move the Service Switch to the “DRAIN” position.

29)Replace the Front Panel and turn on the power supply for 2 minutes.

30)Turn off the power supply.

31)Remove the Front Panel.

32)Repeat the above steps 18) through 31) three more times to rinse thoroughly.

19

Page 19
Image 19
Hoshizaki KML-450MWH 10Move the Service Switch to the “WASH” position, 13Turn off the power supply after 30 minutes