Installation Instructions

Operational After installation, check for gas soundness. The supply pressure

Checkscan be checked at the grill injector. Access to the injector is by first removing the baffle at the front of the grill fastened by two screws. Then remove the fastening screw on the right hand side of the burner and slide the burner off the injector. Ensure that the grill burner is correctly located under the fixing screw on reassembly.

Fit the battery. Fit the hotplate burner bodies, enamelled discs and pan supports. Referring to the instructions for use where necessary.

1.Check that the hotplate and grill burners ignite correctly and burn with a steady flame. Check for a steady flame on the low setting.

2.Check that the burner ignites with the oven set to mark 9 and that the burner stays on when the control is released 3 seconds later. Leave the oven on Mark 9 with the door closed for 10 minutes, then check that when the control is turned to Mark 1 the flame reduces.

Instruct the user on the operation of the cooker.

NOTE:On the models manufactured for use with LPG, it is normal for the

oven and grill burners to burn with yellow tips.

21

Page 21
Image 21
Hotpoint C150 manual Installation Instructions