1 Converting to carrier-grade
This document provides information for the
This chapter provides the steps required to convert the commercial HP ProLiant DL380 G6 Server to its
The conversion to
•Installing fans
•Changing the system maintenance switch
•Installing the ground lug
Before you start
The conversion kit
NEBS certified configuration details are available from your HP sales representative.
Conversion kit contents
Table 1
Description | Part Number | Quantity |
|
|
|
ASSY, FAN DL380G6 | 2 | |
|
|
|
BAG, ZIP LOCK | 1 | |
|
|
|
TERM, RING, VIN | 1 | |
|
|
|
LOCK WASHER | 2 | |
|
|
|
HP ProLiant DL380 G6 |
|
|
1 | ||
|
|
|
BOX, TT 9.5 X 7.5 X 2.25 | 1 | |
|
|
|
BAG, BUBBLE WRAP 6 X 8.5 | 1 | |
|
|
|
Screw, | 1 | |
|
|
|
Preventing electrostatic discharge
To prevent damage to the system, you must take precautions when setting up the system or handling parts. A discharge of static electricity from a finger or other conductor might damage system boards or other
To prevent electrostatic damage, take the following precautions:
•Avoid hand contact by transporting and storing parts in
•Keep
•Before removing parts from containers, place parts on a grounded surface.
•Avoid touching pins, leads, or circuitry.
•Make sure you are grounded properly when touching a
Overview
The following graphic provides an overview of the
Before you start | 3 |