Manuals
/
HP
/
Computer Equipment
/
Data Center Solutions
HP
Performance Optimized Data Center (POD) 240a
manual
End view shown Component
Models:
Performance Optimized Data Center (POD) 240a
1
22
26
26
Download
26 pages
60.09 Kb
19
20
21
22
23
24
25
26
Safety for assembly
Weight
Temporary lighting and power
Page 22
Image 22
End view shown
Item
Component
1
Grounding electrode conductor connection
Required facility connections 22
Page 21
Page 23
Page 22
Image 22
Page 21
Page 23
Contents
Part Number October Edition
Page
Contents
Fire, safety, and security notifications
About this document
Overview
Site assessment
Site preparation
Site requirements
HP Site Preparation Drawing Package
Early infrastructure requirements
Site pad
Other structures
HP POD 240a dimensions and required clearances
Space requirements and clearances
End 2 view clearances shown Side view clearances shown
HP POD 240a weight
HP POD 240a and support equipment sample offload plan
Additional equipment space requirements
Site space and clearance requirements
Future expansions
Safety for assembly
Preparing for delivery and assembly
Suggested assembly installation equipment
Shipping considerations
Assembly prerequisites
Temporary lighting and power
Storage requirements
Environmental considerations
Areas prone to lightning or power surges
Environmental considerations
Cold weather
System utilities
Utilities
Proximity to utilities and drains
Water supply
Drainage
Water quality
Power
Power requirements
Preparing the site for power
Network connections
Required facility connections
Connections to central facility infrastructure
Connection portals
Grounding requirements
Grounding pad
End view shown Component
Supported facility connections
Humidifier
Fire, safety, and security notifications
HP POD 240a security
Glossary
AHJ
NEC
Top
Page
Image
Contents