Contents |
|
Overview | 5 |
About this document | 5 |
Site assessment | 5 |
Site requirements | 6 |
HP Site Preparation Drawing Package | 6 |
Site preparation | 6 |
Early infrastructure requirements | 6 |
Site pad | 7 |
Other structures | 7 |
Space requirements and clearances | 8 |
HP POD 240a dimensions and required clearances | 8 |
HP POD 240a weight | 10 |
HP POD 240a and support equipment sample offload plan | 10 |
Site space and clearance requirements | 11 |
Additional equipment space requirements | 11 |
Future expansions | 11 |
Preparing for delivery and assembly | 12 |
Shipping considerations | 12 |
Suggested assembly installation equipment | 12 |
Safety for assembly | 12 |
Temporary lighting and power | 13 |
Storage requirements | 13 |
Assembly prerequisites | 13 |
Environmental considerations | 14 |
Environmental considerations | 14 |
Cold weather | 14 |
Areas prone to lightning or power surges | 14 |
Seismic activity | 14 |
Utilities | 15 |
Proximity to utilities and drains | 15 |
System utilities | 15 |
Water supply | 15 |
Drainage | 16 |
Power | 17 |
Required facility connections | 19 |
Connections to central facility infrastructure | 19 |
Network connections | 19 |
Connection portals | 19 |
Grounding requirements | 20 |
Supported facility connections | 23 |
Humidifier | 23 |
HP POD 240a security | 24 |
Contents | 3 |