![Plant Exerciser (B1–B2)](/images/new-backgrounds/112420/11242017x1.webp)
Transfer Switch
Plant Exerciser (B1–B2)
The Plant Exerciser option is a
Refer to section 8, pages
Remote Test (R7)
This option provides terminal points for the connection of remote devices that are normally closed and wired in series with the TEST push button. An open circuit simulates failure of the normal source and initiates transfer to the emergency source.
Selector Switch (R2–R4)
Selector switches are available to set the transfer switch for testing, automatic or manual mode, and to test start the engine for troubleshooting and maintenance. Selector switches with an OFF position, option R2, include an OFF indicating light (PL4, white). Switches with a TEST position initiate a load transfer.
NEUTRAL POSITION TIME DELAY (N)
When the normal source contacts open, the NEUTRAL POSITION TIME DELAY starts. The timer circuit on the TCR board, temporarily disconnects the power source to the switching mechanism while the automatic transfer switch is in the neutral position (normal and emergency source contacts open). The adjustable timer is usually set for three seconds. The red START DELAY LED indicates the timer is counting. After the delay, the green END DELAY indicates the TR (timer relay) is energized to reconnect power to the switching mechanism.
Page 9 of 16 Pages