Hubbell manual Sho Twin Spring Stack Electric Cable Reels, Maintenance, Installation

Models: Sho Twin

1 4
Download 4 pages 39.98 Kb
Page 1
Image 1
INSTALLATION and MAINTENANCE INSTRUCTIONS

INSTALLATION and MAINTENANCE INSTRUCTIONS

SHO TWIN SPRING STACK ELECTRIC CABLE REELS

All units are provided with right hand rotation unless otherwise specified. This means that cable is pulled off spool top left or bottom right (spool rotates clockwise to wind cable) when viewing spring end of reel. See diagram on parts page.

MAINTENANCE

Periodically: A. Use compressed air to clean collector assembly and inside of collector housing. Inspect collector assembly for brush wear and pitted slip rings.

Clock-type springs provide power for automatic cable take-up. Spring must be pretensioned at time of installation to insure that tension is applied to cable at all times. A tension adjustment spanner wrench is provided with each reel.

SHO TWIN SPRING STACK ELECTRIC CABLE REELS WARNING

Some reels with large or multiple springs are equipped with a ratcheted adjustment wrench. Follow separate instruc- tions for its use. Failure to use ratcheted wrench, on reels so equipped, could result in serious personal injury.

B. Inspect cable for wear and check mounting bolts and other hardware for tightness.

C. Check for broken springs by pulling about 2/3 cable off reel and observing “Broken Spring Indicators” on sides of spring canisters. See Fig. 3. NOTE:  Bearings and springs are prelubricated and require no periodic maintenance.

“IN” with 2/3

BROKEN SPRING

cable off reel–

INDICATORS

SPRING OK

 

“OUT” with 2/3 cable off reel–

SPRING MAINTENANCEINSTALLATION

BROKEN

Figure 3

SPRING REPLACEMENT WARNING

Do not attempt to relieve spring tension using spanner

wrench. Doing so may result in personal injury.

INSTALLATION

1.Insure that machinery to be serviced by reel is at position closest to reel.

2.Securely mount reel in desired position using 3/8"(M10) bolts. Be sure spool is aligned with cable run.

3.Position optional cable guide, if reel is so equipped.

4.Connect free end of cable to junction box on machine or adjust cable stop so that desired length of cable extends from reel.

5.Remove cover plate on spring housing to expose shaft and spring hub. (See Figure 1).

6.Insert spanner wrench into holes in spring hub (Fig 2). Rotate wrench counterclockwise (for standard rotation). Number of 360º turns should match last digit in model number on serial plate. If model number includes an “R”, reel is reverse rotation and wrench must be rotated clockwise. (See EXPLANATION on parts list page.)

NOTE: If reel is equipped with ratcheted adjustment wrench, follow instructions on separate sheet.

NOTE: On reels containing more than one spring, the hubs are connected at the factory. Therefore, by tightening the outer spring, the inside spring(s) will be tightened.

7.Remove collector cover and connect individual supply conductors to collector terminals.

INSTALLATION section. WARNING

Do not attempt to remove spring from its housing. Clock- type springs can be dangerous to handle. Removal of spring from housing could result in personal injury.

SPRING REPLACEMENT

The unique SAFETYCHANGE® spring motor consists of a spring and hub sealed within a housing. A replacement spring is supplied sealed in its housing and the old unit should be discarded completely.

1.Turn off all electric power.

2.Disconnect cable from machine junction box.

3.Wind all cable onto reel to relieve all spring tension.

4.Remove inspection cover from face of spring housing.

5.Rotate spool clockwise and observe inner shaft. Shaft should rotate clockwise and hub (with spring attached) should remain stationary.

NOTE: Do not attempt to remove spring if resistance is met or hub tends to rotate with shaft.

Continue to rotate spool and strike end of shaft several sharp blows with a lead hammer or rubber mallet until shaft rotates freely and hub remains stationary.

6.Remove (4) nuts which secure spring motor(s) to frame.

7.Slide spring motor(s) off shaft and discard.

NOTE: On multi-spring reels, be sure to remove and save dowel pins which connect one spring hub with another. Also remove snap rings on shaft between spring housings.

8. Install replacement spring motor(s), pawls and pawl springs.

NOTE: Pawl springs must be located between the pawls

and the deepest section of the shaft grooves. Make sure that

 

SPRING

 

HOUSING

 

COVER

 

PLATE

 

SPRING

Figure 1

HUB

 

COUNTER-

 

CLOCKWISE

 

FOR STANDARD

 

ROTATION

Figure 2

SPANNER

WRENCH

pawls and pawl springs are inserted flush with ends of shaft and

hub or they may rub against inspection cover.

 

PAWL

 

SPRING

SPOOL

 

HUB

 

 

SHAFT

 

 

(Spring not

 

 

 

shown)

 

SPRING

 

SHAFT

 

Install

 

SIDE VIEW

END VIEW

GROOVE

against flat

9. Tighten nuts (and extension bolts) securing spring

housing(s) to reel frame.

Manual background CAUTION

Do not exceed number of turns indicated on serial plate. Over-tensioning can cause a broken spring, sheared shaft or other damage.

10.

Connect free end of cable to junction box on machine or adjust

 

cord stop so that desired length of cord extends from reel.

11. Tension spring with spanner wrench. Refer to

 

INSTALLATION section.

12.

Replace inspection cover.

CONTINUED ON BACK PAGE Manual background

Page 1
Image 1
Hubbell manual Sho Twin Spring Stack Electric Cable Reels, INSTALLATION and MAINTENANCE INSTRUCTIONS, Maintenance