8. After concrete has cured, remove bottom pole section from ground sleeve (4). Place
KEEP GROUND SLEEVE CAP ON BOTTOM POLE.
36
5
4
NOTE A:
Place top edge of
tape on mark made in
step 7.
NOTE B:
Tape prevents the pole from rotating during play.
11 | 10/04 | P/N 21168202 |