6. Fill hole completely with concrete.
3
5
4
1" (2.54 cm)
IMPORTANT!: CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.
Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions
7. several times while concrete is curing.
1" (2.54 cm)
NOTE A:
Make a reference mark here for
NOTE B:
Keep flange pushed down to concrete and leveled.
1" (2.54 cm)
DRAINAGE HILL
PLAYING SURFACE
SIDEVIEW
IMPORTANT!: WAIT A MINIMUM OF 24 HOURS BEFORE
GOING ON TO NEXT STEP. CONCRETE MUST CURE.
P/N 21168202 10/04 | 10 |