10.Insert bolt (37) through left side ofupper elevator tube (43), then stretch spring (41) onto bolt (37). Insert bolt (37) through right side ofupper elevator tube (43) and secure with nut (39).
WARNING!
USE EYE PROTECTION
WHEN INSTALLING
SPRINGS.
43
37
41
39
43
28
11.Roll completed assembly to desired position. Fill tank with water (approx. 34 gallons/129 Liters) or sand (approx. 280 lbs./128 kg) and snap cap
(49)in place. Secure assembly to ground using rope (52) and tie down stake (53).
CAUTION!
ADD TWO GALLONS (7.6 LITERS) OF
49
WARNING!
DO NOT LEAVE ASSEMBLY UNATTENDED WHEN EMPTY; IT MAY TIP OVER.
52
53
25 | 07/03 | P/N 211636C |