3.Place the Atomizer in the Upper Reservoir, aligning the three oval holes in the Atomizer with the three prongs in the Upper Reservoir. The side of the Atomizer with three short posts should be facing upward. See Figure 17.
Posts
Atomizer
Figure 17
4.Assemble the Pump Cap and the Funnel Pump by aligning the arrows on both components and inserting the Funnel
Pump into the Pump Cap. Twist the Funnel Pump counter- clockwise until the two components snap together. See figures 18a and 18b.
Pump Cap
Funnel
Pump
Figure 18a
Arrows |
| Pump |
|
| |
|
| Cap |
Funnel
Pump
Figure 18b
5.Attach the Funnel Pump Assembly to the Power Pack by engaging the three tabs on the underside of the fan blade. See Figure 19.
Fan Blade Under- side
Power Pack
Funnel Pump |
| Tabs |
|
| |
Assembly |
|
|
Figure 19
6.Place the Power Pack into the Upper Reservoir so that the three prongs in the Power Pack go through all three holes in the Atomizer and into the three prongs in the base of the
Upper Reservoir. Make sure the Power Pack is securely seated and all three prongs are in the proper position. See Figure 20.
Power Pack
Atomizer
Holes in the
Atomizer
Upper
Reservoir
Figure 20
NOTE: The prongs will only fit into the Upper Reservoir one way.
7.Follow the directions in the section REFILLING THE WATER
TANK to complete reassembly.
©2008 Hunter Fan Co. | 7 | 41785 Rev |