Husqvarna CTH2542 XP TO ASSEMBLE BAGGER See Figs. 5A-5C, BAGGER ADJUSTMENT See Fig, Assembly

Models: CTH2542 XP

1 52
Download 52 pages 49 Kb
Page 8
Image 8
FIG. 4B

ASSEMBLY

Using the nuts and flat washers removed from tractor back plate, install the bagger support tube to the back plate as shown. Tighten securely.

SUPPORT

TUBE

FLAT

WASHER

3/8 NUT

BOLT

02330

 

FIG. 4B

Install the two upper support brackets through the back plate and to the chassis, install the clevis pin 10x17mm and secure with retainer spring.

Assemble both support brackets to the outside of the bagger support tube using two each 3/8 x 63,5mm hex bolts13/32" I.D.flat washers and 3/8 locknuts from parts bag. Tighten securely.

Replace discharge chute into rear opening of tractor. Secure the chute with the two hook straps.

CLEVIS PIN 10 X 17MM

3/8 LOCK NUT

SUPPORT BRACKET

10,3MM (13/32")

FLAT WASHER

3/8 X 63,5MM HEX BOLT

RETAINER SPRING

90

 

025

FIG. 4C

NOTE:The strap hook must go through the discharge chute only. Do not allow the hook to enter the slot in the tractor back plate.This will allow the discharge chute to float with the mower deck when moving on uneven terrain.

DISCHARGE

CHUTE

HOOK

02306

BACKPLATE

SLOT

FIG. 4D

8

TO ASSEMBLE BAGGER (See Figs. 5A-5C)

Unfold bag by pivoting front bagger tube all the way forward and pressing the bottom vinyl binding onto the tube.

Inside the bag, install spreader bars and retainer springs onto pins on both sides of bag as shown.

Press the vinyl bindings onto the sides of front bagger tube.

Slide the bagger dump handle through the hole in the bagger top, install the clevis pin 10 x 44mm and secure with retainer spring.

FRONT BAGGER TUBE

05

029

 

VINYL BINDING

FIG. 5A

SPREADER BARS

RETAINER

SPRING

VINYL

BINDING

RETAINER SPRING

06 029

FIG. 5B

Push cap over end of bagger dump handle.

NOTE: For future use, the clevis pin may be removed in order to use the handle to clear the chute in the event it has become clogged.

DUMP HANDLE

TUBE

CLEVIS PIN 10 X 44MM

RETAINER SPRING

CAP

907

02

 

FIG. 5C

BAGGER ADJUSTMENT (See Fig. 6 & 7)

For proper bag function and appearance, it may be nec- essary to adjust the bagger assembly.There should be 6mm (1/4")-9mm (3/8") gap between the bagger top and fender and the bagger top surface should be even with the top surface of the fender. To adjust bagger position:

Page 8
Image 8
Husqvarna CTH2542 XP owner manual TO ASSEMBLE BAGGER See Figs. 5A-5C, BAGGER ADJUSTMENT See Fig, Assembly