IBM IBM UPS 10000XHV, IBM UPS 7500XHV setup guide Remove the access panel see B in the diagram

Models: IBM UPS 7500XHV IBM UPS 10000XHV

1 29
Download 29 pages 38.85 Kb
Page 10
Image 10
3.Remove the access panel (see B in the diagram).

2.Switch the uninterruptible power supply input circuit breaker (see A in the diagram that follows) and the utility circuit breakers off.

3.Remove the access panel (see B in the diagram).

4.Remove the circular knockouts on the access panel.

5.Run wires through the access panel to the terminal blocks. Connect the wire to the ground block first. Adhere to all national and local electrical codes. (See tables and diagram.)

6.Use appropriate cable fitting to achieve strain-relief on the hardwired input and output power cables.

7.For three-phase input, set the Input Phase Selector switch (see C in the diagram) to ‘3’. For single-phase input, leave the switch in the default position of ‘1’.

8.Switch the circuit breakers on.

9.Check the line voltages.

10.Replace the access panel.

Mounting the Uninterruptible Power Supply in a Rack and Attaching the Front Bezel

! Attach the mounting brackets.

" Install the rails per the rail installation diagram in the Rail

 

Kit. Referencing the chart below, install the cage nuts (or clip

 

nuts). The solid squares indicate the cage nut or clip nut loca-

 

tion. Mount the uninterruptible power supply at the bottom of

 

the rack.

 

Note: Leave 3 U of space below the uninterruptible power

 

supply for each battery pack that you plan to install.

6