IBM IBM UPS 10000XHV, IBM UPS 7500XHV setup guide Tower Configuration

Models: IBM UPS 7500XHV IBM UPS 10000XHV

1 29
Download 29 pages 38.85 Kb
Page 12
Image 12
Tower Configuration

Tower Configuration

Attention: Before converting to a tower configuration, remove the battery modules (see Removing the Battery Modules).

! Remove the rail guides.

" Bring the unit to tower position, and remove the display

 

bezel by sliding to the left and out. Rotate the display bezel

 

and reinstall. Install the first battery module at the bottom.

# Reinstall the remaining three battery modules.

$ Connect the batteries.

% Reinstall and secure the battery doors with captive

& Attach the bezels.

screws. Make sure that the cords are positioned so that they do

 

not get pinched. Attach the top panels.

 

8

Page 12
Image 12
IBM IBM UPS 10000XHV, IBM UPS 7500XHV setup guide Tower Configuration