b. Adjust the height of the leveling feet by rotating the leveling feet either upward
or downward according to the level of the surface on which the rack is placed.
Repeat this for the remaining leveling feet as needed.
c. When the rack is leveled, tighten the locking nuts on all of the leveling feet.
5. Align the slots in the stabilizer with the mounting holes in the bottom front of the
I/O rack.
6. Ensure that the base of the stabilizer rests firmly on the floor.
7. Install the two mounting screws and hand-tighten.
8. Use the crank supplied with the system unit to alternately tighten the mounting
screws until they are firmly seated.
Leveling Feet (4)
Locking Nut
Mounting Hole
Mounting Screw
Stabilizer
Chapter 1. System Installation Procedure 5