Manuals
/
Brands
/
Computer Equipment
/
Computer Hardware
/
IBM
/
Computer Equipment
/
Computer Hardware
IBM
S85
- page 85
1
85
86
86
Download
86 pages, 857.21 Kb
75
Contents
Main
Page
Contents
iii
iv
Safety Notices
danger
v
caution
Electrical Safety
Laser Safety Information
vi
Data Integrity and Verification
vii
Page
About This Book
ISO 9000
ix
Online Publications
Related Publications
Trademarks
x
Chapter 1. System Installation Procedure
Step 1. Inventory
Electronic Service Agent for RS/6000 Users Guide
PCI Adapter Placement Reference
Diagnostic Information for Multiple Bus Systems
Step 3. Check the Customer Environment
2
Step 4. Check Customer Outlets
not
Step 5. Set Up the System Racks
4
Page
Page
Step 6A. Attach the I/O Rack to a Concrete Floor
Attaching the I/O Rack to a Concrete Floor
must
8
Page
Attaching the I/O Rack to a Concrete Floor Beneath a Raised Floor
must
10
Page
12
Page
Step 6B. Attach the System Rack to a Concrete Floor
14
Attaching the System Rack to a Concrete Floor
Attaching the System Rack to a Concrete Floor Beneath a Raised Floor
16
Page
Step 7. Attach the Front Electrical Outlet
18
Page
Page
Page
Step 8. Attach the Rear Electrical Outlet
Page
Page
Page
Page
Step 10. Install the I/O Rack Door Guide
Page
Step 14. Update the Device Records
Step 15. Attach External Devices
Step 16. Connect the Power
Step 17. Power On and Check Out the System
Diagnostic Information for Multiple Bus Systems
Step 18. Service Processor Setup and Test
Step 19. Install the Modem and Electronic Service Agent
30
Electronic Service Agent for RS/6000 Users Guide
Step 20. Finish the Installation
Page
Page
Chapter 2. Using the System Verification Procedure
Step 1. Considerations before Running This Procedure
Step 2. Loading the Diagnostics
Step 3. Running System Verification
Step 4. Additional System Verification
34
Step 5. Stopping the Diagnostics
Page
Page
Page
Page
Appendix A. Communications Statements
Federal Communications Commission (FCC) Statement
European Union (EU) Statement
Page
Electromagnetic Interference (EMI) Statement - Taiwan
Radio Protection for Germany
Page
Appendix B. Environmental Notices
Product Recycling and Disposal
Environmental Design
Unit Emissions
Page
Appendix C. Notices
Page
Appendix D. Cabling the System Rack and I/O Rack
Connecting JTAG and Operator Panel Cables
Use the following figure to connect the JTAG and operator panel (OP) cables.
48
I/O Rack Rear Locations
Page
10 EIA Unit I/O Drawer Rear View
52
10 EIA Unit I/O Drawer System board Locations
54
Service Processor Card Locations
Fan Monitor Control (FMC) Card Locations (10 EIA Unit I/O Drawer)
Power Distribution Board Locations
56
Connecting RIO and SPCN Cables
System Rack Attached to One I/O Drawer
58
System Rack Attached to TwoI/O Drawers
OR
Drawer 0, Primary
System Rack Attached to Three I/O Drawers
System Rack Attached to Four I/O Drawers
Appendix D. Cabling the System Rack and I/O Rack 59
60
System Rack Attached to TwoI/O Drawers
System Rack Attached to Three I/O Drawers
Drawer 1 or 2
Appendix D. Cabling the System Rack and I/O Rack 61
System Rack Attached to Four I/O Drawers
62
Appendix E. System Records
S80 and S85 System Rack Cabling Configurations - SPCN Cabling
64
Primary I/O Drawer Device Records
Table1. Internal and External Options in Primary Drawer (0)
66
Table2. Internal Files and Devices in Primary Drawer (0) 10 EIA Unit I/O Drawer (continued)
Additional I/O Drawer Device Records
68
Table3. Internal and External Options in Secondary Drawer (1)
Table4. Internal and External Options in Secondary Drawer (2)
Table4. Internal and External Options in Secondary Drawer (2) (continued)
Table5. Internal and External Options in Secondary Drawer (3)
Table5. Internal and External Options in Secondary Drawer (3) (continued)
70
Page
Page
Readers Comments Wed Like to Hear From You
BUSINESS REPLY MAIL