IBM SC34-7012-01 manual

Models: SC34-7012-01

1 268
Download 268 pages 41.5 Kb
Page 63
Image 63

information saved in the system log from a previous run. The primary and secondary system log streams are purged and CICS begins writing a new system log.

vBecause CICS is starting a new catalog, it uses a new logname token in the “exchange lognames” process when connecting to partner systems. Thus, remote systems are notified that CICS has performed a cold start and cannot resynchronize.

vUser journals are not affected by starting CICS with the START=INITIAL parameter.

Note: An initial start can also result from a START=COLD parameter if the global catalog is newly initialized and does not contain a recovery manager control record. If the recovery manager finds that there is no control record on the catalog, it issues a message to the console prompting the operator to reply with a GO or CANCEL response. If the response is GO, CICS performs an initial start as if START=INITIAL was specified.

For more information about the effect of the state of the global catalog and the system log on the type of start CICS performs, see the CICS System Definition Guide.

Chapter 4. CICS cold start 51

Page 63
Image 63
IBM SC34-7012-01 manual