before the logic error occurred. If the database needs to be recovered to the point when the Primary server failed, then a rollforward to end of logs should be performed:
db2 “rollforward database ts1 to end of logs and stop”
or
db2 “rollforward database ts1 to 2000-06-19-20.57.00.0000 and stop”
15. Start the SAP system: log on as ts1adm user on the Backup server and issue the command
startsap
Standby Database Scenario | 30 |