Assembly
Before beginning assembly, carefully read the following information and instructions:
•Place all parts in a cleared area and remove the packing materials from the spa shell. Do not dis- pose of the packing materials until assembly is completed and the spa is operating.
•During assembly, make sure that all parts are oriented as shown in the drawings.
•Read each assembly step before you begin.
•Tighten all parts as you assemble them, unless instructed to do otherwise.
ASSEMBLY REQUIRES THE FOLLOWING TOOLS (not included):
•One (1) phillips screwdriver
•You may also need a small amount of soap or water.
A wire connector is provided on the electronics pack of the spa to connect a minimum No. 8 AWG (8.04 mm2) solid copper conductor between the spa and any metal equipment, electrical enclosure made of metal, metal water pipes, or conduit within five feet of the spa.
1. Before beginning assembly, make sure that you |
have read and understand the information in the |
box above and on the previous two pages. |
Remove the eight 1/4” x 1 1/2” Machine Screws (7) |
from the Access Panels (2, 5). Remove the Access |
Panels by sliding them down and then pulling the |
bottoms of the Access Panels away from the spa. Be |
careful not to damage the spa shell. |
If desired, snap the three included pillows to the spa |
shell at this time. Each pillow can be attached in |
either a high position or a low position. To determine |
the desired position, attach a pillow to the spa shell, |
note its position, remove it, turn it 180°, and then |
reattach it. |
2. Refer to the drawing on page 6 and locate the pump |
access opening. Locate the drain hose inside the |
opening. Close the valve knob on top of the drain |
1 | Spa Shell | Pillow | Spa Shell |
|
| ||
|
|
| |
Pillow |
|
| Pillow |
|
|
| 2 |
| 5 |
|
|
| 7 |
| 7 |
|
|
| |
2 |
|
|
|
hose. Next, make sure that the cap is fully tightened |
onto the end of the drain hose. |
Locate the four gate valves inside the pump access |
opening (there are two gate valves per pump). Make |
sure that the gate valves are open and that the lock- |
ing clips are snapped onto the stems of the gate |
valves, as shown in the inset drawing. |
Make sure that the four collars are tightened (there |
are two collars per pump). |
Refer to step 1 above. |
Panel (2) to the spa with the four 1/4” x 1 1/2” |
Machine Screws (7). |
Locking
Clip
Stem
Gate Valve
Gate Valve
Collars
Gate
Valve
Drain
Cap Valve Hose
Knob
8