STEP 4 (See Cable Loop & Diagram 4)
A.) Attach the 119” Upper Cable (#10) to the front opening on the Upper Frame (#8). Make sure the ball stopper on the Cable is under the opening.
B.) Attach a Pulley (#9) to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#7), two Bushings (#6), and one M10 Aircraft Nut (#5).
C.) Draw the Cable towards the back of the machine to the second opening on the Upper Frame. Repeat Step B above to install a Pulley.
D.) Draw the Cable downward. Place a Pulley in between the two Pulley Brackets (#21). Secure them together with one M10 x 2” Allen Bolt (#17), two ∅ ¾” Washers (#43), and one M10 Aircraft Nut (#5). Draw the Cable around the Pulley and the Bracket hanging for now.
E.) Pull the Cable upward towards the open bracket on the Top Socket Assembly and install a Pulley to the bracket.
F.) Pull the Cable downward to the opening hole on top of the Weight Holder. Thread the tip of the Cable into the hole to firmly secure the Cable.
G.)Attach the 104” Lower Cable (#23) to the upper opening on the Front Vertical Beam (#22) and install a Pulley. Make sure the ball stopper is in the front of the Beam. Draw the Cable underneath the Pulley then pull up to the hanging Pulley Bracket previously installed.
H.) Install a Pulley to the lower opening on the hanging Bracket. Note: There are a few holes on the Bracket. Use these holes to adjust the tightness of the Cables by selecting different holes. Draw the Cable over the Pulley then downward to the open bracket on the Front Vertical Beam.
I.) Install a Pulley to the open bracket. Pull the Cable underneath the Pulley toward the lower opening on the Front Vertical Beam. Repeat the Step B above to install a Pulley.
J.) Insert a M10 x 2 3/8” Allen Bolt (#7) through the hole underneath the Pulley. Tighten it with two ∅ ¾” Washers (#43) and one M10 Aircraft Nut (#5).
K.) Attach a
L.) Repeat the Step K to install the Lat Bar (#1) and the Double
8