STEP 8 (See Diagram 8 & Lat Bar Cable Loop Diagram)

A.) Follow the below instructions to use the Lat Bar.

B.) Attach a Tech Rod Cable (#11) to the Right Pulley on the Extension Tube (#43). Attach the other end, L Shaped Connector (#41) to one of the Tech Rod.

C.) Attach one 57” Lat Cable (#35) to the right Pulley on the Upper Pulley Support Bar (#18). Draw the Cable over the Pulley then downward to the right Pulley on the Extension Tube (#43). Connect the Lat Cable to the End Hook (#31) on the right Tech Rod Cable (#11).

Repeat the same procedure to install the other Lat Cable.

D.) Connect the Lat Bar (#37) or two Hand Straps (#38) to the End Hooks (#31) on the two Lat Cables.

E.) Connect the end of two 40” Leg Developer Cables (#36) to the Leg Developer (#30) using an End Hook (#31). Draw the other end of the Cable underneath the Cable Roller to the Cable Hanger (#42) on the side of the Vertical Frame. Repeat the same procedure to install the other Leg Developer Cable. This is just a storage position for the Leg Developer Cables.

F.) Use the L-shape Connector (#41) on the Tech Rod Cable to connect the selected Tech Rods. Please refer to the Resistance Chart on page 18.

DIAGRAM 8

11

Page 13
Image 13
Impex TR-2 manual See Diagram 8 & Lat Bar Cable Loop Diagram