STEP 3 | (SEE DIAGRAM 3) | |
A.) | Attach a ∅7/8” Washer (#13) onto a M10 x 4 ½” Bolt (#24). Insert the Bolt through the | |
| Butterfly (#22). Place a M10 Regular Nut onto the Bolt. Then insert the Bolt through the hole | |
| on the Rear Upright Beam (#1). Secure the Bolt with a Knob (#11) behind the Upright | |
| Beam. Repeat the same step to install the other Butterfly. | |
B.) | Attach the Left Butterfly Handle (#19) to the Left Butterfly (#22). Secure it with a | |
| M10 x 2 ¼” Bolt (#18), ∅ 7/8” Washer (#13), and M10 Aircraft Nut (#15). Repeat the same | |
| step to install the Right Butterfly Handle (#21). | |
C.) | Attach the Leg Developer (#47) onto the bracket on the Front Stabilizer (#49). Secure it | |
| with a Hex Socket Axle (#43) and Hex Socket Screw (#46). |
D.) Insert two Foam Roll Tubes (#48) halfway through the hole on the Leg Developer (#47). Push four Foam Rolls (#39) onto the tube from both sides.
E.) Place a Spring Clip (#4) onto the weight holder on the Leg Developer.
DIAGRAM 3
6