Packing List
Before installing your board, ensure that the following materials have been received:
•1
•1 Utility
•1 CPU Heat sink (Assembled)
•1 CPU thermal dissipation paste
•1 Thermal pad (Assembled)
•1
•1 Hard drive isolation pad (Assembled)
•1 Hard drive bracket (Assembled)
•1
•Several screws
•1 warranty certificate document
If any of these items are missing or damaged, contact your distributor or sales representative immediately.
Warning! Any changes or modifications made to the equipment which are not expressly approved by
the relevant standards authority could void your authority to operate the equipment.
iv |