SECTION 5: ELECTRICAL SCHEMATICS
WHIRL WIZARD 115 VOLT - 60 HZ - SINGLE PHASE
SEQUENCE OF OPERATION
1.After the sink is filled with water, power switch (S1) is placed in the “ON” position.
2.Motor contactor (R1) is energized.
3.Pump motor (M1) starts.
4.Heater element (H1) is energized.
5.Power light (E1) is energized.
NOTE: THE HEATER ELEMENT CONTAINS AN
Whirl Wizard Technical Manual
Issued:
14