Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS manual Secure the rails, Step

Models: SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS

1 32
Download 32 pages 61.07 Kb
Page 23
Image 23
Secure the rails.

3 WALL: TOWER AND CURVED GLASS INSTALLATION

STEP 9

STEP 11

Secure the rails.

Install cover cap on wall post.

COVER CAP

STEP 10

Tighten the tower base bolt. Two shut-off valves are provided. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw valve to stub outs at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting.

STEP 12

Install glazing gasket on curved glass wall post on the inside. Note orientation of gasket. Soapy water may help to insert the glazing gasket.

COLD

SHUT OFF

GLASS

VALVES

 

(PROVIDED)

 

 

WALL POST

INSIDE OF

 

ENCLOSURE

 

 

HOT

 

GLAZING GASKET

BOLT

 

 

TOWER TOP PLATE

 

INSIDE OF

GLAZING GASKET

ENCLOSURE

 

 

 

21

Page 23
Image 23
Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS manual Secure the rails, Install cover cap on wall post, Step