DETAILED TROUBLESHOOTING

E250P/P12SW subwoofers

DETAILED TROUBLESHOOTING

A. Power Amp Section

Resistance

Resistance from S+ (SPK O/P) to GND should be >1M (NO LOAD)

Check

 

 

Resistance from V+ (C6 P+) to V- (C8 P-) gradually Fully CHARGED should read >10k

 

 

 

Resistance from V+ (C6 P+) to S+ (SPK O/P) should read >1M

 

 

 

Resistance from V- (C8 P-) to S+ (SPK O/P) should read >1M

 

 

2. Power Up LED RED

With a 5mV signal to Low level input, LED should change to GREEN

 

-Voltage measurements (DVM)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OP AMP

 

 

 

 

 

 

 

 

 

LED

 

P-U4(1)

P-U4(7)

 

 

 

 

 

 

 

 

RED

 

0Vrms

11.84VDC

 

 

 

 

 

 

 

GREEN

 

7.13Vrms

-12.93VDC

 

 

 

 

 

 

 

3. D.C. Operation

 

 

 

 

 

 

 

 

 

 

 

-Voltage measurements (DVM) on CLASS D POWER AMP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Between

 

V+

 

Q4(E)

Q1(C)

Q10(C)

U7(1)

U7(2)

 

U7(4)

U7(6)

U7(7)

U7(8)

And This

 

GND

 

V-

GND

GND

GND

GND

 

GND

GND

GND

GND

Point

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Get this

 

71.7V

 

0V

-71.7V

0V

-71.7V

-71.5V

 

-71.2V

0V

0V

4.65V

Reading

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. Check Switching Frequency

Oscilloscope - USE THE PROBE TIP TO U6(7) TO GND

Reading 100kHz +/-10%,24Vp-p

B. Pre Amp Section

Line Level Input Sensitivity

-Set up

Turn level, X’OVER FREQ POT Fully CW and LFE switch off

 

Generator Set at 200mV@50Hz

 

Signal to Line level input

17

Page 18
Image 18
JBL Detailed Troubleshooting, E250P/P12SW subwoofers, A. Power Amp Section, Power Up LED RED, 3. D.C. Operation