Jettech Metal Products X-32 technical manual Chemical hook-up, Installation Check List

Models: X-32

1 10
Download 10 pages 41.33 Kb
Page 8
Image 8
Chemical hook-up

Chemical hook-up

This unit is equipped with three (3) chemical pumps. Each will inject a different liquid product at a specific time during the wash cycle. The chemical pumps have sufficient length of tubing hose that can be inserted in gallon containers near the dishwasher.

The chemical pumps have colored tubing for ease of identification. The colors are as follow;

Red for Detergent Clear for Sanitizer Blue for Rinse-additive

To prime the pumps; you must complete two full wash cycles.

You can adjust the amount injected by turning the white screw on the chemical pump.

Installation Check List

-Is the dishwasher connected electrically?

-Is the breaker turned on?

-Is there water connected to the dishwasher?

-Is the water valve opened?

-Are the chemicals properly set?

Starting the dishwasher the first time

When starting the dishwasher for the first time, you will notice that the only chemical that gets drawn in is the detergent. The other chemicals will get drawn only during the wash cycle.

For more information go to Operation section.

7

Page 8
Image 8
Jettech Metal Products X-32 Chemical hook-up, Installation Check List, Starting the dishwasher the first time