INSTALLATION

Installation Existing Construction:

1.Use a stud locator to identify the location of the ceiling joists on each side of the proposed loudspeaker mounting location.

2.Mark ceiling joists’ edges, using masking tape.

3.Repeat this process for the other loudspeaker locations.

4.You may have to adjust the loudspeaker mounting locations based on how the ceiling joists line up with the proposed speaker mounting locations.

5.Check for clearance using the following method:

a.Drill a 1/4” pilot hole in the center of the intended speaker location.

b.Cut a foot-long piece of coat hanger.

c.Bend the wire, creating a right angle, leaving 4-1/4” at one end.

d.Poke the “L-shaped” wire into the pilot hole and turn it in a complete circle, checking for obstructions.

e.Push it up into the ceiling cavity to make sure you have approximately 4” of depth.

f.If the coat hanger’s movement is obstructed by anything, fill the hole(s) with spackle and try another location.

6.Locate the hole template and remove the inside portion of it. The inside portion can be used as a paint mask, if you are painting the frame of the loudspeaker.

7.Use a pencil and hole template to trace the hole outline in the desired location on the ceiling.

8.Use a drywall saw to cut along the penciled line.

9.Strip 1/4” of insulation from the end of each wire coming from the amplifier.

10.Tightly twist the end of each wire until no frayed ends remain.

11.Attach the speaker wires to the speaker terminal connectors. Connect the negative output from the amplifier to the black terminal and the positive output to the red terminal.

12.There are four clamps “dogs” which hold each speaker in place. Rotate all the dogs inward.

13.Insert the loudspeaker into the cutout in the ceiling.

14.The dogs are tightened via four front-baffle screws. Tighten the dogs by turning the screws clockwise, while pressing the loudspeaker against the ceiling. NOTE: DO NOT OVER TIGHTEN THESE SCREWS. Over- tightening the screws may make the grille difficult to install.

15.Install the grille into the speaker.

16.Repeat this procedure for the next speaker.

New Construction Installation:

Install the proper ceiling bracket for this loudspeaker (NCB-6) using the instructions supplied with the bracket. After the

hole is cut in the drywall per the bracket instructions, perform the following steps:

1.Strip 1/4” of insulation from the end of each wire coming from the amplifier.

2.Tightly twist the end of each wire until no frayed ends remain.

3.Attach the speaker wires to the speaker terminal connectors. Connect the negative output from the amplifier to the black terminal and the positive output from the amplifier to the red terminal.

3

Page 5
Image 5
JobSite Systems LSC-BG manual Installation Existing Construction, Mark ceiling joists’ edges, using masking tape

LSC-BG specifications

JobSite Systems LSC-BG is a cutting-edge software platform designed specifically for the construction industry, offering a comprehensive solution to streamline operations and enhance project management. Its primary aim is to facilitate better communication and collaboration among teams working in the field. This platform integrates various technologies and features that cater to the complex requirements of construction projects.

One of the standout features of JobSite Systems LSC-BG is its robust project management tools. These tools enable users to create, track, and manage tasks and deadlines efficiently. The intuitive interface allows team members to assign responsibilities, monitor progress, and adjust timelines as necessary. This level of organization helps to reduce delays and keeps projects on track.

The platform also incorporates real-time data analytics, providing users with valuable insights into project performance. With dashboards that display key performance indicators, team leaders can quickly assess productivity levels and identify areas for improvement. This data-driven approach supports informed decision-making, ultimately enhancing project outcomes.

JobSite Systems LSC-BG leverages mobile technology to keep teams connected, regardless of their location. The mobile app allows workers to access important project information, update task statuses, and communicate seamlessly with colleagues in real time. This mobility ensures that everyone is on the same page, significantly improving coordination and efficiency on construction sites.

Moreover, the software is built on a cloud-based architecture, ensuring that all project data is securely stored and easily accessible. This cloud integration means that users can collaborate from anywhere, eliminating the need for physical meetings and reducing project delays caused by geographic constraints.

The system also emphasizes safety management, incorporating features that help teams monitor compliance with safety protocols and regulations. Users can conduct safety inspections and track incidents directly through the platform, promoting a culture of safety that is paramount in the construction sector.

In addition, JobSite Systems LSC-BG supports integration with other essential software tools, allowing businesses to customize their workflows and maintain existing applications. This compatibility ensures that companies can transition to the platform without disrupting their established processes.

In summary, JobSite Systems LSC-BG stands out as a versatile and powerful solution for the construction industry, embodying essential features like project management, real-time analytics, mobile access, cloud storage, safety management, and seamless integration with other tools. Its comprehensive capabilities make it an indispensable resource for enhancing productivity and collaboration in construction projects.